Underground

City Light & Power (CLP) conducted “On the Job” Training with four (4) Airmen from the 60th Civil Engineer Squadron on various days in August 2015.  CLP covered the proper procedure for installing High Voltage cable in underground ducts and worked with the Airman to install cable in over 2000 feet of duct bank.


1.    15.1.3        Install Underground Cable In Duct